

Final work on the electrics: shore power
On May 13, 2018
- Afloat! 2017-2019

Input socket installed just inside the cockpit

Double socket tucked away behind a bulkhead
Most work on the electrics was done last July, before the launch, but we’re also having shore power, easier to install before she goes back in the water.
Steve spends Friday and Saturday wiring it all in so it’s as unobtrusive, but accessible as possible.
Comments are Disabled