Deck fittings, coachroof and a cuppa on board!

Final fix for deck fittings before she’s painted

While we wait for the metalwork to be returned, there’s plenty more to do!

The long bolt is drilled, and secured just above the rudder stock and rings for the mainsheets are all secured through the deck.

The big plastic box storing yards of tangled electrical cables is unpacked and instruments are checked, then fitted in place ready for the electrics to be re-installed. The bilge pumps, in particular, are scrutinised and cleaned up ready for service.

Sadly, it seems the depth sounder hasn’t survived, so there’s quite a bit of research to source a replacement to be fitted before the launch.

The deck is cleaned and masked up ready for painting

Steve will be returning to Derbyshire in the Bongo, via Birmingham to pick up Simon, and plans to get the deck painted with at least one coat before leaving on 14 July. The weather is kind, with a gentle drying breeze and no rain . . .

He plans each day allowing time for a few more coats of varnish and then gets the coachroof painted in Epifanes no. 24 with non-slip pearls added, to match the hull. Before the chainplates can be fitted, due to the change in design, there’s six more frames to be fitted inside the hull – a piece of work unaccounted for in the list of ‘essential to do before launch’ list!

Bev sets to work masking up all the varnished areas in contact with the deck in preparation for painting. She takes the car back home on 10 July to get some more work done on the house before Simon and Steve return at the end of the week.

Rik & Celeste from ‘Cine Mara’, Dutch OGA

We know Dutch OGA friends Rik and Celeste on ‘Cine Mara’ and Fred on ‘Morgaine’ are visiting the East Coast. We track them down while they’re at anchor in the Deben, and invite them for a cuppa – our first visitors on board, even if she’s still in the tent on her cradle!